Rondo Energy, Covestro break ground on 100MWh thermal energy storage site in Germany – EnergyShiftDaily
rondo-energy,-covestro-break-ground-on-100mwh-thermal-energy-storage-site-in-germany

Rondo Energy, Covestro break ground on 100MWh thermal energy storage site in Germany

Thermal energy storage systems like the Rondo Heat Battery address a critical challenge in industrial operations: providing continuous high-temperature process heat from intermittent renewable energy sources.

The technology stores surplus renewable energy electricity by heating ceramic bricks to temperatures exceeding 1,000°C. When steam is required, the stored thermal energy generates emission-free steam via conventional boiler systems, replacing fossil-fuel combustion.

Dr Thorsten Dreier, chief technology officer at Covestro, described the heat battery as enabling progress toward circular economy and climate-neutral production goals.

“The heat battery is such an idea: a new technology that enables us to take another step forward on our path to a sustainable future,” Dreier stated during the groundbreaking ceremony.

The RHB technology utilises proven thermal storage principles, employing ceramic bricks as the storage medium paired with modern automation and control systems.

According to Rondo, the TES system charges during periods of surplus renewable energy electricity availability, typically 6-8 hours daily, and provides continuous heat output for industrial processes.

Steam production accounts for a major energy demand in chemical manufacturing operations, and Covestro’s Brunsbüttel site currently relies on natural gas for steam generation.

Covestro plans to assess the potential for larger-scale thermal storage deployment based on the Brunsbüttel site’s operational experience, indicating possible expansion of the technology across the company’s global manufacturing network.

The Brunsbüttel deployment joins a growing portfolio of industrial thermal storage projects across multiple sectors. Heineken recently signed agreements for a 100MWh TES to provide process heat for brewing operations in Portugal.

Heineken and Rondo Energy inked a heat purchase agreement (HPA) in early November 2025, with the project scheduled to go live in April 2027.

Industrial thermal storage adoption has accelerated as companies seek alternatives to natural gas for process heating. EDP and Rondo Energy have collaborated on industrial TES deployments that demonstrate the commercial viability of brick-based heat storage systems for large-scale industrial applications.

The technology’s expansion into international markets continues with Rondo Energy’s deployment of Southeast Asia’s first industrial heat battery, a 32MWh system for a cement factory in Thailand, which was announced as in operation in November.

Energy-Storage.news publisher Solar Media is hosting the Energy Storage Summit EU 2026 in London, UK, on 24-25 February 2026 at the InterContinental London – The O2. See the official website for more details, including agenda and speaker lists.