
Subsidiary of the AES Corporation, AES Indiana, has announced the opening of the 200MW/800MWh Pike County Battery Energy Storage System (BESS) in Pike County, Indiana, US.
The Pike County BESS is set to be one of the largest BESS projects in the Midcontinent Independent System Operator (MISO) region.
This article requires Premium SubscriptionBasic (FREE) Subscription
Enjoy 12 months of exclusive analysis
- Regular insight and analysis of the industry’s biggest developments
- In-depth interviews with the industry’s leading figures
- Annual digital subscription to the PV Tech Power journal
- Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
Energy-Storage.news reported in January 2024 that the Indiana Utility Regulatory Commission (IURC) had approved the project.
The project is built on the site of AES Indiana’s former coal-fired plant, the Petersburg Generating Station.
Building the BESS at this location allows AES to use the coal plant’s interconnection points. Additionally, the Pike County BESS was part of a larger approximately US$1.1 billion total investment in Pike County, Indiana.
These investments included repowering the Petersburg Generating Station units 3 and 4 from coal to natural gas and adding two new solar and BESS projects.
AES says that the coal units will be converted to natural gas by the end of 2026 and anticipates being the first utility in the state to eliminate coal as a generating resource.
This is a notable move from AES since, as reported by the US Energy Information Administration (EIA), in 2023, the state was the second-largest consumer of coal in the US behind Texas. “Coal fuelled 45% of Indiana’s electricity net generation that year.”
Indiana created a voluntary clean energy portfolio standard in 2011, which set a goal of 10% clean energy by 2025. 30% of the goal can be met with “clean coal” technology.
In 2022, two gas peaker plants and a gas pipeline extension were approved by regulators in the state. Expert testimony from Citizens Action Coalition (CAC) was given against this decision but was refuted by utility representatives.
According to AES’s Integrated Resource Plan (IRP), the company plans for 46% of its generation portfolio to be from natural gas by 2026.
The company is also looking to have 6% of its portfolio consist of BESS and 3% of wind generation resources.
Held alongside the Battery Show Expo Europe in Stuttgart, Energy Storage Germany spotlights Germany’s rapid ascent in the European storage sector. Once driven by residential demand, utility-scale projects are now surging, with 184 MW added across 44 projects in 2023. With nearly 16 GWh of capacity installed in the first half of 2024, Germany is set to integrate 24 GW of utility-scale energy storage by 2037, creating substantial opportunities.
The 2024 Summit included innovative new features including a ‘Crash Course in Battery Asset Management’, Ask-Me-Anything formats and debate-style sessions. You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
InterContinental London – The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!
Read Next
ACE Power has submitted a 2,000MWh BESS in Queensland to Australia’s Environment Protection and Biodiversity Conservation (EPBC) Act.
Clean energy trade body American Clean Power Association (ACP) has released a report on energy storage market reforms for regional grid operators based on findings from the Brattle Group.
Battery storage developer and operator Spearmint Energy has secured US$250 million for two battery energy storage system (BESS) projects located in Texas, US, totalling 400MWh.
US non-lithium battery technology companies Eos Energy Enterprises and Unigrid have announced partnerships to deploy their tech abroad, striking deals in the UK and India respectively.
Most Popular
Email Newsletter
This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.