![BrightNight and Cordelio sign PPA](https://www.energy-storage.news/wp-content/uploads/2025/02/ezgif-76be9463d6d06.jpg)
IPPs BrightNight and Cordelio have announced a new power purchase agreement (PPA) for a 300MW solar and 1,200MWh battery energy storage system (BESS) facility with utility Arizona Public Service (APS), in Arizona, US.
Located in Yuma County, Arizona, the Pioneer clean energy centre will create what BrightNight says is hundreds of construction and operation jobs, as well as substantial tax revenue for the local community. The facility is expected to begin construction in September 2025 with commercial operation expected April of 2027.
This article requires Premium SubscriptionBasic (FREE) Subscription
Enjoy 12 months of exclusive analysis
- Regular insight and analysis of the industry’s biggest developments
- In-depth interviews with the industry’s leading figures
- Annual digital subscription to the PV Tech Power journal
- Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
BrightNight is headquartered in Florida and specialises in hybrid renewables-plus-storage and standalone battery storage projects. The company secured a US$440 million investment commitment from Goldman Sachs Alternatives in August 2024.
BrightNight also has projects around the world. In October of last year, the company received the green light from the Victoria government, Australia, for its 360MW Mortlake solar-plus-storage project.
In the same month, Energy-Storage.news reported that BrightNight was seeking approval from the Arizona Corporation Commission (ACC) for a Certificate of Environmental Capability (CEC) to construct a generation tie-in transmission line in La Paz County, Arizona (Premium access article), to connect its Eagle Eye solar-plus-storage project to the local grid.
Headquartered in Toronto, CA, Cordelio owns and manages more than 1,200MW of renewable energy assets across North America, specialising in large-scale solar PV and wind.
The company previously partnered with BrightNight on Box Canyon, a 300MW solar PV and 600MWh BESS project in Pinal County, Arizona. A PPA was signed for the output of this project in July 2022.
Arizona has a growing electric demand. Electric load in the Phoenix Metropolitan area is forecast to continue growing rapidly. According to the Arizona Corporation Commission, the state set a record high for peak energy demand during heatwaves in early August and July of 2024. As the state continues to grow, energy demands will follow.
APS has been part of multiple offtake agreements for clean energy projects in Arizona, signing a PPA with US developer Avantus for a 100MW solar PV project in Pinal County, Arizona. Prior to the PPA with Avantus, APS signed a tolling agreement with Strata Clean Energy for the 100MW/400MWh White Tank energy storage project in Avondale, Arizona.
APS also signed a 20-year tolling agreement with Strata in May 2023 for a 255MW/1GWh BESS. That project was the result of an All-Source request for proposals (RFP) conducted by APS in 2022.
Brian Cole, vice president of resource management at APS said of the recent PPA with BrightNight and Cordelio: “At APS, we thoughtfully evaluate and select projects that bring the most long-term value to our customers.”
“The Pioneer Clean Energy Center is part of our expanding solar power and battery energy storage portfolio developed to meet growing demand with reliable service. Projects like Pioneer will help deliver cost-competitive energy to Arizona’s communities over the next several decades.”
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.
arizona, arizona public service, battery energy storage system, bess, brightnight, construction, cordelio, developer, offtake, ppa, solar, solar-plus-storage, utility
Read Next
Developer-operator GridStor has acquired a 150MW/300MWh battery energy storage system (BESS) project in Texas, US from Balanced Rock Power (BRP).
Renewable energy developer Ampyr Australia has secured Shell Energy Australia’s remaining stake in the 1GWh Wellington battery energy storage system (BESS) in New South Wales.
The Solar Energy Industries Association (SEIA) has released a whitepaper recommending the US deploy 10 million distributed solar installations and reach 700GWh of installed storage capacity by 2030.
IPP Enfinity Global has announced two battery energy storage system (BESS) projects in Texas, US with a total capacity of 425MW/850MWh.
Most Popular
Email Newsletter
This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.