
The UK government has published a Technical Decision Document confirming crucial aspects of its long duration electricity storage (LDES) cap-and-floor scheme, which includes increasing the minimum duration required from six hours to eight.
The document, released by regulator Ofgem on 11 March, details the final overarching rules and requirements for the scheme as well as how it will be implemented, though significant detail still remains to be worked out.
This article requires Premium SubscriptionBasic (FREE) Subscription
Enjoy 12 months of exclusive analysis
- Regular insight and analysis of the industry’s biggest developments
- In-depth interviews with the industry’s leading figures
- Annual digital subscription to the PV Tech Power journal
- Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
Read Next
Thimo Mueller of AEMO Services, believes the value of energy storage in Australia will be higher than investor expectations.
Florida’s largest utility, Florida Power & Light (FPL), is ramping up its energy storage ambitions across the Sunshine State, with plans to deploy over 2.2GW of new BESS between 2026 and 2027.
We hear from startup Volklec which, like another European battery company Elinor, will build its batteries with a Chinese technology and manufacturing partner. They both say this will get around the challenges that ultimately doomed Europe’s first wave of battery startups, with Northvolt today declaring bankruptcy in Sweden.
The development of global standards and specifications for the electrolyte used in vanadium redox flow batteries (VRFBs) is “crucial” for the technology’s prospects.
Most Popular
Email Newsletter
This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.