Each solar PV project has the option to develop a co-located battery storage system. Image: Lightsource bp. Solar developer Lightsource...
Execution discipline redefines energy storage value in Europe, as investable projects become harder to secure
Yet many investors and acquirers report the opposite: while more storage projects are formally ‘in market’ than ever before, genuinely...
RES Australia joint venture bags EPBC Act approval for 3.6GWh solar-plus-storage project in Queensland
CS Energy’s Greenbank BESS in Queensland. Wooderson Solar Development Co’s solar-plus-storage project will include a DC-coupled BESS. Image: CS Energy....
European Union members make mixed progress in implementing energy storage strategies
“In this context, energy storage solutions are pivotal to ensuring a resilient and sustainable energy future for the EU,” the...
FRV set for 1.2GW/5GWh BESS rollout in Spain
A catalyst for FRV’s BESS drive in Spain is the response to last year’s Iberian power outage, which has led...
Redefining BESS bankability in 2026: from installed capacity to operational performance
Lenders are increasingly focused on assets with demonstrable operational proof. What matters now is: megawatts in operation, transparent performance records, and...
4-hour projects, 15-year toll: Neoen, Statkraft, Zenobē and Infranode progress BESS in Northern Europe
The 15-year toll provided by Drax is one of the longest-term seen in the UK. Image: Drax. A flurry of...
VIDEO: The application gap between BESS asset operation data and insights
TWAICE start by setting the context: what BESS teams say their top priorities and constraints are in 2026. Using survey...
India: Energy storage tech scope widens with 100MWh flow battery, 100GW pumped hydro and grid-forming BESS prospects
Flow batteries store energy in tanks of liquid electrolyte, with separate power stacks. This means that, unlike lithium-ion (Li-ion) batteries,...
Enable the next wave of applications and opportunity: Cubenergy’s FlexCombo 2.0 flexible energy storage AC block
Standardised interfaces and reserved space for expansion allow capacity upgrades without major redesign, aligning with European project financing and phased...