Enel starts building 100MW grid-forming BESS at Chile solar PV plant  – EnergyShiftDaily
enel-starts-building-100mw-grid-forming-bess-at-chile-solar-pv-plant 

Enel starts building 100MW grid-forming BESS at Chile solar PV plant 

The Finis Terrae solar PV project, where the BESS is being built
The Finis Terrae solar PV project, where the BESS is being built. Image: Enel Green Power.

Enel Green Power, part of the Italy-based power group Enel, has launched construction on another large-scale BESS in Chile. 

Enel Green Power Chile has launched construction on the Finis Terrae battery energy storage system (BESS), it said earlier this week (17 August). It is being integrated with the existing Finis Terrae solar PV park in the northern Antofagasta region. 

The BESS has a power rating of 100MW at the interconnection point and has grid-forming capabilities. This will enable it to provide services to the grid that help maintain stable voltage and frequency on the grid of the National Electric System (NES).

It is the sixth large-scale BESS project from Enel Green Power in Chile that Energy-Storage.news is aware of. The firm says it has a storage capacity of 730MW in the country. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Already a subscriber? Sign In

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or continue reading this article for free

It is also building the BESS Las Salinas (205MW) and Azabache BESS (94MW) projects. Projects that are now in commercial operation meanwhile are the La Cabana BESS (34MW), the Don Humberto BESS (67MW) and the El Manzano BESS (67MW). Enel typically hasn’t revealed the BESS supplier for its projects.

Chile is one of the most active grid-scale markets for storage globally, and by far the regional leader in Latin America. BESS are being deployed to provide stability services to the grid but primarily to support the country’s solar PV fleet which has seen huge curtailment and negative pricing challenges in the last few years. 

Stats came out recently on how much curtailment energy storage has already reduced. BESS durations are typically 4-6-hours in Chile reflecting the solar load shifting applications.

Just this month, developer Limes reached ready-to-build (RTB) stage on a 1GWh project, Verano Energy ordered 660MWh from Sungrow for a project, while ContourGlobal started building a 131MWp solar, 90MW/360MWh BESS project. 

Projects are often commercialised via long-term offtakes with big industrial groups or utilities. 

Such has been the pace of activity, Chile reached its 2027 energy storage deployment target a year early and looks set to reach its 2050 target by 2027.

Our publisher Solar Media, part of Informa Connect, will host the Energy Storage Summit Latin America 2026 on 26-27 October, 2026, in Santiago, Chile. Energy-Storage.news readers can use our discount code ESN20 at checkout for 20% off tickets.  

Energy Storage Summit Latin America brings together developers, investors, utilities and policymakers to explore how storage is advancing system stability, regulation, deployment and new revenue models across the region. With insights from Chile, Argentina, Brazil, Mexico and beyond, the Summit focuses on financing, policy clarity, hybridisation, supply chain development and project optimisation as LATAM accelerates its storage buildout.

Read Next

A new report from climate consultancy Ember highlights the important relationship between energy storage and solar, unlocking the “era of anytime solar.”

Italian clean energy developer Limes Renewable Energy has reached the ready-to-build stage at its 200MW/1GWh Huañil project.

Australian developer Edify Energy has reached financial close on the Ganymirra and Majors Creek solar-plus-storage projects near Townsville in North Queensland, featuring 360MWp of solar generation and 300MW/1,200MWh of battery storage.

Scatec has started full commercial operations at its gigawatt-scale Obelisk solar-plus-storage project in Egypt.

Independent power producer (IPP) Verano Energy has awarded the battery energy storage system (BESS) supply for its 152MW/606MWh Observatorio project to Sungrow.

Most Popular