
Building BESS is complicated, with myriad considerations around supplier contracts, site acceptance tests, data analysis, interface between different contractors to factor in.
The ‘Lessons Learned from BESS Construction Projects’ panel discussion at the Energy Storage Summit 2026 in London in February dived into all of that and more, featuring:
- Andy Colthorpe, Editor – Energy-Storage.news, Solar Media
- Steven Xuereb, Executive Director, Kiwa
- Kai-Philipp Kairies, CEO, ACCURE Battery Intelligence
- Gili Almagor, Director of Energy Storage, Nofar Energy
The Summit is the flagship event in our publisher Solar Media’s series of energy storage-focused events globally, which now totals 16, all of which you can learn more about here. We’ve already posted several sessions from the event and will continue to post more in the coming weeks.
This article requires Premium SubscriptionBasic (FREE) Subscription
Already a subscriber? Sign In
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or continue reading this article for free
See the full video of the panel discussion on construction below, and all the ones posted so far here.
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.
Read Next
Hithium has signed a formal investment commitment to establish a manufacturing facility in Spain’s Navarre region.
ESN Premium discusses “long-term value creation” for infrastructure investors, with Daniel Burrows of BESS developer Eku Energy.
The attractiveness of the BESS market for M&A and investment, amidst a slowdown in activity, was discussed on a panel at the Energy Storage Summit 2026 in London.
Alinta Energy has commenced main construction works on its 1,000MWh Stage 1 of its Reeves Plains BESS in South Australia.